Do You Need Planning Permission for Solar Panels in Northern Ireland?

The short answer for most homes

The rules at a glance

How we assess planning before any work starts

01
Address check

House or flat, listed or not, inside a conservation area or World Heritage Site, and whether an earlier permission removed permitted development rights.

02
Roof check

Which slopes face a road, whether the array stays inside the roof edges and below the ridge, and on a flat roof how high the frame will sit.

03
Proceed, adjust or apply

If it is permitted development, we say so and proceed. If it is borderline, we suggest a layout that keeps it within the rules, such as a rear slope. If an application is needed, we prepare and submit it with the drawings the council expects, and we do not start work until it is decided.